How to close the PLC security gap
PLC
How to close the PLC security gap
Alex · 19 July 2016
An industrial control system (ICS) is used to control equipment in a local area such as a production plant, while a supervisory control and data acquisition (SCADA) system is used to control equipment in a wide geographical area such as an electric power grid. A SCADA system may be thought of as a subset of ICS.
The basic element of an ICS is an industrial controller known as a programmable logic controller (PLC). Programmed into the memory of the PLC are the operations of the equipment in the ICS. Industrial control systems began as stand-alone racks of relays that were isolated from external threats.
When PLCs were developed in the early 1970s, they were used to replace relays in control systems for automobile assembly lines; then memory reprogramming changes were accomplished with car model year changes. Today, software applications have been integrated into control systems. This added connectivity has increased the vulnerability of these systems to malicious attacks.
Malware has been developed by hackers to attack the ICS of critical facilities, such as by the Dragonfly and the Havex malware hacker groups, to destroy equipment and threaten human life. The attacks can be carried out by nation-state and non-state hacker teams with little or no risk of detection or attribution. Critical facilities include, for example, nuclear power plants, hydroelectric dams and oil/gas pipelines. An example of a destructive malware incident is the 2010 Stuxnet malware attack on the ICS of the Natanz nuclear enhancement plant in Iran. There, Stuxnet was designed to alter the programming stored on the memories of the PLCs of the Natanz ICS, to cause dangerous changes in rotational speeds of the refining centrifuges, causing 1,000 centrifuges to destruct.
Stuxnet was able to alter the programming stored on the memories of the Natanz PLCs because the memories were rewriteable. PLCs with rewriteable memories were originally developed in an era that was free of malware attacks. This rewriteable characteristic is the same for the memories of all extant PLCs in industrial control systems around the world and is the same for PLCs now being produced and sold. Alternatively, a PLC memory having a non-rewriteable characteristic, once programmed, cannot be written to again and will block malware from altering the programming stored on that memory.
Facilities seek to protect their control systems against malware attack with defensive software, including firewalls and whitelisters. Hacker teams have computerized methodologies, such as fuzz testing and using Shodan, to find connectivity paths and zero-day faults through which to reach their targets of rewriteable PLC memories.
The rewriteable memories of PLCs are fixed in place on a circuit board of the PLC, are programmed in place and are reprogrammed in place. When, instead, non-rewriteable memories are utilized in PLCs, the PLC must be configured such that a programmed non-rewriteable memory can be inserted into or removed from an exterior socket on the PLC.
Non-rewriteable media
Non-rewriteable data storage media are available as solid-state, non-volatile memories, which presently include SD Flash cards. These aren’t inherently non-rewriteable; they require dedicated programming steps to become non-rewriteable. Plug-in. connecting sockets are available for SD card memories, just as in consumer digital cameras. The non-rewriteable memories of a new-design PLC must be removable and insertable, using connecting sockets in the PLC. The memory connecting socket is necessary because, once programmed, the program stored on the non-rewriteable memory cannot be rewritten. If change of programming for the memory in a PLC is needed, a new non-rewriteable memory will need to be programmed and taken by the technician to the PLC, for insertion in the socket of the PLC.Concept PLC and operations
The concept PLC will have an exteriorly located socket for insertion of a non-rewriteable memory. The socket will have a hinged cover which, when open, will make the socket available to the technician for removal of an inserted memory and for insertion of a memory. The hinged cover will have features such as being gasketed and lockable, with the cover and lock alarmed against tampering. The programming of the non-rewriteable memory could take place in the control room of the ICS. The memory programming methodology, and the needed circuitry for programming, will be in accordance with the manufacturer’s procedures for the type of solid-state memory being utilized. The lock-down, or write-protect, of the blocks or sectors of the memory will be instituted during the programming procedures of the memory. There will be a programming box with socket for the memory and wire to connect to the operator’s PC. Solid-state memories, because of their small physical size or of their connecting pin fragility or of potential static electricity damage, may need to be handled in accordance with the memory manufacturer’s recommendations, using a grounded tool, when, for example, the memory is being inserted into, or removed from, a socket or being placed into or removed from a container. After the memory is programmed, and lock-down or write-protect is performed, the data stored on a block or sector, or the entire data storage on the memory, will be checksummed in accordance with the memory manufacturer’s checksum procedure for the type of memory being utilized. The calculated datum from the checksum algorithm will be stored in the control room for record and comparison purposes. The programmed non-rewriteable memory will be placed into a box for transport by the technician from the control room to the designated PLC. If there is a memory presently inserted in the PLC, the technician will also take a second, empty box, pre-annotated for the memory to be removed. Before the programmed non-rewriteable memory can be removed from the PLC and a subsequent programmed non-rewriteable memory inserted into the PLC, there must be a safe, programmed shutdown of the zone of ICS equipment controlled by the PLC. The shutdown is analogous to the safe, programmed shutdowns commanded by shaft vibration monitors and set-point excursion monitors. There are factors that bear on these planned shutdowns of equipment operations.- Critical facilities can be essentially steady-state, and thus at critical facilities PLC memory programming changes are less frequently needed, when compared with PLC memory programming changes needed at, for example, process plants.
- Critical facilities may have as many as 30 PLCs in a facility. To accomplish PLC memory changing in a critical facility, it may be that only one, or several, equipment zones need be safely shut down at one time.
- The damages that took place at Natanz show that hacker teams will develop malware to maliciously reprogram rewriteable memories of extant PLCs in process plants, as well as in critical facilities.